- Fix transfer-cost error (Bern 800k exemption removed); Basel-Stadt 1.5% self-occupied Neuerwerb → seller-levied, add Schuldbrief cost + cost table - Add renovation CHF 500-600k derivation, inclusions, timing, overrun risks - Replace one-line earthquake note with sourced SED/SIA 269-8 explainer - Mirror all edits into dossier.md; inline source links + Sources footers
21 lines
1.9 KiB
Markdown
21 lines
1.9 KiB
Markdown
# Q&A / Analysis (English) — 1. Property Summary
|
||
|
||
**Müllheimerstrasse 55, 4057 Basel — 3.5-room condominium.** A 84 m² net-living-area apartment on the 2nd floor of a 1975, 6-storey multi-family building in the **Matthäus quarter** (Kleinbasel), a central, lively, well-connected inner-city district near the Rhine, trams and buses.
|
||
|
||
| Attribute | Detail |
|
||
|-----------|--------|
|
||
| Asking price | **CHF 625'000** (≈ CHF 7'440 / m²) |
|
||
| Size | 84 m² net living + 4 m² loggia + 4 m² balcony + 5 m² cellar |
|
||
| Layout | 3.5 rooms, 2 bedrooms, 1 bathroom (tub), separate guest WC, separate kitchen |
|
||
| Floor / building | 2nd of 6 floors, lift, 14 residential units (co-ownership share 54/1000) |
|
||
| Year built / condition | 1975 · **"renovation-needed"** — kitchen & bath partly original |
|
||
| Heating | District heating (Fernwärme), radiators |
|
||
| Parking | **None** |
|
||
| Outdoor | Loggia (quiet courtyard side) + balcony (street side) |
|
||
| Annual owner costs | **CHF 7'416/yr** (incl. CHF 2'700 renewal-fund contribution) |
|
||
| Renewal fund (whole bldg.) | CHF 117'014 at 31.12.2024, growing +CHF 50'000/yr |
|
||
|
||
**Ownership context (from the STWEG documents):** managed by Regimo Basel (new manager Dinvest AG from ~2025/26); the co-owners' association has **planned a phased façade + roof energetic renovation of the whole building — the sum of three staged estimates (roof + PV, rear & front façade) ≈ CHF 500'000–600'000 incl. subsidies, earliest start ~3 years out** (full breakdown in §3), plus an ordered earthquake-safety assessment (~CHF 10'000). Fire-safety upgrades (new flat entrance doors, etc.) were completed in 2024. A ground-floor doctor's practice will be converted to two flats by another owner at that owner's cost.
|
||
|
||
**One-line take:** an honestly-priced, centrally-located city flat with good bones and clear modernization upside — but it comes with a renovation to-do list (yours inside, the building's outside) that the low headline price already reflects.
|